Roxas City, Capiz — Western Visayas

Solar Installation Company
in Roxas City

Roxas City, the Seafood Capital of the Philippines, is embracing solar energy as CAPELCO costs rise. SolarStream installs hybrid solar systems for Roxas homes, businesses, and seafood processing facilities with full net metering guidance.

Book Free Assessment Estimate Your Savings
₱11-13
CAPELCO Rate (₱/kWh)
₱0
Assessment Fee
25yr
Panel Warranty
4–6yr
Avg. Payback Period

The Seafood Capital Goes Solar — Save on CAPELCO Bills

Roxas City's thriving economy — from seafood processing to tourism — runs on electricity. With CAPELCO rates at ₱11–₱13/kWh and rising, solar delivers reliable savings and 4–6 year payback.

CAPELCO Bills Cut 90–97%

A correctly sized hybrid system eliminates the variable portion of your CAPELCO bill. Most Roxas City homeowners keep only the fixed monthly charge.

Ideal for New Subdivisions

Roxas City's modern subdivisions have clean rooftops with ideal south-facing orientation — perfect for dense panel layouts.

Brownout Protection

LiFePO4 hybrid batteries switch to backup in under 20ms during CAPELCO outages — silent and automatic.

Full CAPELCO Net Metering

We can guide you through the CAPELCO net metering application — from PEE-signed plans to the final bidirectional meter installation.

Roxas City Savings Snapshot
Monthly CAPELCO Bill
Recommended System
Monthly Savings
Payback
₱3,000–₱5,000
3KW Hybrid
₱2,500–₱4,500
5–7 years
₱5,000–₱10,000
6KW Hybrid
₱4,500–₱9,000
4–5 years
₱10,000–₱20,000
10KW Hybrid
₱9,000–₱18,000
3–5 years
₱20,000+
15–30KW
₱18,000+
3–4 years
Calculate My Savings

All-In Solar Packages for Roxas City Homes

Every package includes Tier-1 panels, hybrid inverter, LiFePO4 battery, mounting, LGU permit guidance, and CAPELCO net metering.

3KW Hybrid
Home Starter
₱150K–₱200K all-in
For ₱2,000–₱5,000/month CAPELCO bills
  • 6 × 500W monocrystalline panels
  • 3KW hybrid inverter (Solis/Deye)
  • 5.12kWh LiFePO4 battery
  • Permit guidance included
  • CAPELCO net metering guidance
10KW Hybrid
Large Home / Commercial
₱520K–₱700K all-in
For ₱10,000–₱20,000/month CAPELCO bills
  • 16 × 620W monocrystalline panels
  • 10KW hybrid inverter (Solis/Deye)
  • 15kWh LiFePO4 battery
  • Permit guidance included
  • CAPELCO net metering guidance

How to Go Solar in Roxas City

1

Free Site Assessment

Our Metro Cebu team visits your Roxas City property to assess your roof, electrical panel, and past CAPELCO bills.

2

Custom System Design

We design a system sized to your consumption and submit CAPELCO net metering pre-approval documents at no cost.

3

Professional Installation

Certified installers mount Tier-1 panels and hybrid inverters. Most Roxas City jobs finish in 2–3 days.

4

CAPELCO Commissioning

We coordinate the CAPELCO inspection and bidirectional meter. You start saving from Day 1.

Roxas City Barangays We Cover

Banica
Baybay
Cagay
Cogon
Culasi
Dayao
Dumolog
Gabu-an
Lawaan
Libas
Loctugan
Milibili
Poblacion I-XI
Tanza
Talon

Frequently Asked Questions

A 3KW hybrid is ₱150K–₱200K and the 6KW hybrid is ₱330K–₱450K — both all-in including CAPELCO net metering, LGU permit guidance, and LiFePO4 battery.
Yes. Roxas City is within CAPELCO's service area. SolarStream handles the complete CAPELCO net metering application on your behalf.
Yes. Our hybrid LiFePO4 battery systems switch to backup in under 20ms automatically — no generators, no noise.
Most residential installs in Roxas City are done in 2–3 days. Our team is Metro Cebu-based and regularly services North Cebu suburbs.

SolarStream Covers Nearby Cities

Roxas City Roxas City is part of our Western Visayas service zone. We also serve:

Ready to Cut Your CAPELCO Bill in Roxas City?
Get a Free Solar Assessment.

SolarStream visits your Roxas City property, reviews your CAPELCO bills, and gives you an exact quote — no obligation.

Book Free Assessment Estimate Online First