SolarStream installs hybrid solar systems in Dumaguete City — the "University City of the South" — and across Negros Oriental. From student boarding houses to commercial buildings, we deliver full NORECO net metering service end-to-end.
Dumaguete City hosts Silliman University, Foundation University, and several other institutions — creating a dense population of students, staff, and businesses with high electricity consumption. NORECO charges ₱11–₱13/kWh, making solar one of the most impactful investments in Negros Oriental.
A correctly sized hybrid system eliminates the variable portion of your monthly NORECO bill — leaving only the minimal fixed charge.
Boarding houses and dormitories near Silliman University have high baseload demand — ideal for solar offset and battery backup.
LiFePO4 hybrid batteries switch to backup power in under 20ms — protecting study time and business operations from NORECO outages.
We handle the complete NORECO I and NORECO II cooperative net metering application — from engineering plans to bidirectional meter.
Every package includes Tier-1 panels, hybrid inverter, LiFePO4 battery, mounting, LGU permits, and NORECO net metering coordination.
*Indicative pricing. Exact cost depends on roof type, configuration, and site. Free assessment provides exact quote.
Our team handles everything — from site visit to NORECO commissioning.
Our engineers visit your Dumaguete or Negros Oriental property to evaluate roof, electrical panel, and past NORECO bills.
We design a system sized to your load profile and prepare NORECO net metering pre-approval documents at no cost.
Certified installers mount Tier-1 panels and hybrid inverters. Most residential installs complete in 2–3 days.
We coordinate the NORECO inspection and bidirectional meter installation. You start saving from Day 1.
SolarStream covers Dumaguete City and municipalities across Negros Oriental.
SolarStream visits your Dumaguete home, dormitory, or commercial property and gives you an exact custom quote — no obligation.